RIVERWOOD PARKWAY

PROJECT

RIVERWOOD PARKWAY

OVERVIEW

Riverwood Parkway from Cumberland Blvd (W.) to Cobb Parkway is a
4 lane median separated street that is .16 miles in length. The roadway has dedicated left and right turn lanes as well as a service road and office building driveways that grants access to major existing and new office developments located along the short stretch of roadway.  The Riverwood Parkway improvements are expected to be complete by the end of 2017.

This project will include:

  • New 5-foot wide sidewalks along both sides of the roadway
  • Pedestrian and street lighting
  • Landscaped medians
  • Decorative crosswalks
  • Three landscaped plazas with brick pavers, benches and trash receptacles

FINANCIALS

Total Project Cost = $654,000

DOWNLOADS

Project Fact Sheet